Hainan steel mesh skeleton pipe
Hot melt connection is a common connection method used in the construction of steel mesh skeleton plastic composite pipe. It is not only simple, but also has good effect, so it is widely used. However, some details should be paid attention to when connecting.
1. During pressure maintaining and cooling, it is not allowed to move the steel mesh skeleton plastic composite pipe connector or apply any external force on the connector.
2. Clean the dirt on the heating surface with clean cotton cloth before and after hot melt connection.
3. The temperature control of hot-melt connection tools shall be accurate, the temperature distribution of the heating surface of the steel mesh skeleton plastic composite pipe shall be uniform, and the structure of the heating surface shall meet the welding process requirements.
4. The heating time, heating temperature, applied pressure, pressure holding and cooling time of hot-melt connection shall comply with relevant regulations.
When the steel mesh skeleton plastic composite pipe is connected by hot melt, try not to apply pressure to the pipe. When heating, keep the temperature evenly distributed on the pipe. Pay attention to control the temperature to ensure the smooth connection process.