What are the installation steps of Hainan plastic manhole?

Your current location: home page >> News >> technical knowledge

What are the installation steps of Hainan plastic manhole?

Date of issue: 2019-06-07 Author: Click:

        What are the installation steps of?

First of all, the main parts and accessories from our plastic manhole, shaft, well cover, shaft rubber ring, shaft seat rubber ring, saddle joint and so on are delivered to the destination through regular logistics, ensuring the integrity of the product. After arriving at the destination, The receiving unit should first choose an open space away from the building for stacking, because the building and ancillary works have not been completed, and there are non-standard operations, such as falling something from the upstairs, if it hits the PE plastic inspection well and accessories, it will cause damage and unnecessary waste.

Hainan plastic inspection wells should be handled with care when unloading, and attention should be paid to the area diversion slot well seats, mud sinking well seats, and their sizes and specifications (such as starting well seats, straight well seats, 90 ° well seats, 45 ° well seats, three-way and four-way well seats, etc.), so that it is not only convenient to count the number, but also convenient to accurately control according to the model and type when using, and improve the construction efficiency.

Standardized and civilized construction is advocated during the construction and installation of the plastic inspection well. When connecting the well and the pipe, lubricant (such as white cat detergent) should be applied to the rubber ring of the branch pipe and the inner wall of the well seat socket, and professional tightening tools should be used for tightening. Hammering and excavator grabbing should be avoided to avoid damage to the plastic well and pipeline.

After installation and backfilling, cover and bind the shaft opening with fabric to prevent sediment and sundries from falling into the well during construction.

After the installation of the shaft, cover the shaft if necessary, so as to prevent sundries from falling.

In general, if the man-made damage to the plastic manhole can be stopped, the standardized and civilized construction is the place to make full use of the energy-saving and environmental protection plastic manhole, so as to be "solid" in the real sense.

 Hainan plastic inspection well