Hainan Plastic Inspection Well

contact us

Company name: Hainan Plastic Industry Co., Ltd

Contact: Manager Chen

Tel: 18189796380

Address: 200 meters northeast of Jinshengda, the extension line of Qiuhai Avenue, Longhua District, Haikou

Website: wuzhengyi.cn

Loading and unloading requirements of HDPE high density polyethylene pipe

Your current location: home page >> News >> technical knowledge

Loading and unloading requirements of HDPE high density polyethylene pipe

Date of issue: 2023-05-23 Author: Click:

1) HDPE high-density polyethylene pipes are mainly loaded and unloaded mechanically. Flexible belts, slings or slings shall be used for installation during loading and unloading. Wire ropes and chains shall not be used for loading, unloading or transportation of pipes.
2) When loading and unloading HDPE pipes, two support lifting points should be used, and the two support lifting points should be placed at a quarter of the pipe length to keep the pipe stable.
3) During the pipeline loading and unloading process, the pipeline shall be prevented from hitting or falling, especially the pipe end protection. If there is any scratch, the supplier shall be contacted in time for proper treatment.

During the loading and unloading of HDPE HDPE pipes, it is an important link to cause damage to pipes and other problems. Therefore, it is necessary to load and unload the pipes in strict accordance with the requirements, and take protective measures to avoid damage to pipes and affect the use.

Hainan steel mesh skeleton pipe

Website: //wuzhengyi.cn/news/559.html

key word:

Recent browsing:

Related products:

Related news: